Need to know
Round-up of the latest roadworks in Hull
Here are the current and upcoming roadworks confirmed by Hull City Council.
- Alfred Gelder Street, June 15 to late July: Highway improvement works between Lowgate and Drypool Bridge. Road closure in place. (Hull City Council)
- Arnold Lane, June 23 to 25: Utility works outside Miranda House. Multi-way signals in place. (O2)
- Barham Road, until August 24: Cable replacement scheme at the junction with Marfleet Lane. Multi-way signals in place. (Northern Powergrid)
- Beverley Road, June 25 to 26: Repair and replace damaged manhole cover. Multi-way signals in place. 8pm to 6am only. (Yorkshire Water)
- Carden Avenue, until June 30: Utility works. Multi-way signals in place. (Northern Powergrid)
- Copenhagen Road, until June 23: Repair burst water main opposite Ambulance Station. Multi-way signals in place. (Yorkshire Water)
- Dorchester Road, until June 25: Telecoms cable install at the junction of Bridport Close. Multi-way signals in place. (BT)
- Drypool Bridge, until late July: Full bridge closure to all vehicles and pedestrians for major repair and strengthening works. (Hull City Council in partnership with Esh Construction and Mason Clark Associates)
- Ennerdale, until October 29: Roundabout improvement works. Lane closure in place. (Hull City Council)
- Ganstead Lane, June 22 to 26: Utility works. Two-way signals in place. (Yorkshire Water)
- Hessle Road, until June 29: Utility works. Multi-way signals in place. (MS3)
- Holderness Road, June 26: Road core investigatory work from the junction of Holderness Road and Summergangs Road. Multi-way signals in place. (Hull City Council)
- Inglemire Lane, June 20 to August 21: Cable replacement scheme at the junction of Auckland Avenue. Multi-way signals in place. (Northern Powergrid)
- Laburnum Avenue, until June 24: Repair burst water main at the junction of Acacia Drive. Multi-way signals in place. (Yorkshire Water)
- Logan Close, June 29 to July 10: Utility works at the junction of Midmere Avenue and Logan Close. Multi-way signals in place. (BT)
- Marfleet Lane, until June 25: Utility works at the junction of Barham Road. Two-way signals to be manned between 7am and 7pm. (Northern Powergrid)
- National Avenue, June 30: Road core investigatory work from Bontoft Avenue to Perth Street West. Multi-way signals in place. (Hull City Council)
- Stoneferry Road, June 29 to July 1: Utility connection works for Stagecoach bus depot. From Withernsea Street to Foster Street. Lane closure in place. (Advanced Electricity Networks Limited)
- Wawne Road roundabout, until August 6: Council improvement scheme. Roundabout connecting Bude Road, Wawne Road and Holwell Road. Road closure in place. (Hull City Council)
- Willerby Road, until June 22: Utility works. Lane closure in place. (Yorkshire Water)
- Winchester Avenue, June 23 to July 1: Utility works from the junction of Marfleet Lane to Winchester Avenue. Multi-way signals in place. (Northern Powergrid)
- 14th Avenue, until July 6: Utility works from the junction of 14th Avenue and 22nd Avenue. (Northern Powergrid)
- For more traffic and travel news, click here.






